首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
A broad public discussion of environmental problems began in the mid-1980s, when the first "green" groups formed in opposition
A broad public discussion of environmental problems began in the mid-1980s, when the first "green" groups formed in opposition
admin
2022-10-30
138
问题
A broad public discussion of environmental problems began in the
mid-1980s, when the first "green" groups formed in opposition to
Erevan’s intense industrial air pollution and to nuclear power generation
in wake of the 1986 reactor explosion at Chernobyl. Environmental【S1】_________________
issues helped form the basis of the nationalist independence movement
when environmental demonstrations subsequently merged with these for【S2】_________________
other political causes in the late 1980s.
In independent Armenia, environmental issues divide society into
those who fear of" environmental time bombs" and those who view【S3】_________________
resumption of pollution-prone industrial operations as the only mean of【S4】_________________
improving the country’s economy. In the early 1990s, the latter group
blamed Armenia’s economic woes on a role played by the former in【S5】_________________
closing major industries.
In 1994 three national environmental laws were in effect; the Law
on Environmental Protection, the Basic Law on the Environment, and the
Law on Mineral Resources. The Council of Ministers, Armenia’s cabinet,
includes a minister of the environment. Therefore, no comprehensive【S6】_________________
environmental protection program has emerged, and decisions on
environmental policy have been made on an ad hoc basis.
Environmental conditions in Armenia have been worsened by the
Azerbaijani blockade of supplies and electricity from outside. The results
of the blockade and the failure of diplomatic efforts to lift it led the
government propose reconstruction of the Armenian Atomic Power Station【S7】_________________
at Metsamor, which was closed after the 1988 earthquake because of its
location in an earthquake-prone area and what had the same safety problems【S8】_________________
as reactors listed as dangerous in Bulgaria, Russia, and Slovakia.
After heating debates over startup continued through 1993, French and【S9】_________________
Russian nuclear consultants declared operating conditions basically safe.
Continuation of the blockade into 1994 gave added emergency to the【S10】________________
decision.
【S9】
选项
答案
heating—heated
解析
词义混淆。heating是heat的现在分词形式,表示“加热的,供热的”,heated的意思是“激昂的,激烈的”,这里用来修饰名词debates,应该用后者,故将heating改为heated。
转载请注明原文地址:https://www.kaotiyun.com/show/GRBK777K
0
专业英语八级
相关试题推荐
OnPublicSpeakingI.People’sfrequentresponsetogivingtheirfirstspeech:feel【T1】______【T1】______II.Thespeaker’ssecr
OnPublicSpeakingI.People’sfrequentresponsetogivingtheirfirstspeech:feel【T1】______【T1】______II.Thespeaker’ssecr
OnPublicSpeakingI.People’sfrequentresponsetogivingtheirfirstspeech:feel【T1】______【T1】______II.Thespeaker’ssecr
OnPublicSpeakingI.People’sfrequentresponsetogivingtheirfirstspeech:feel【T1】______【T1】______II.Thespeaker’ssecr
OnPublicSpeakingI.People’sfrequentresponsetogivingtheirfirstspeech:feel【T1】______【T1】______II.Thespeaker’ssecr
OnPublicSpeakingI.People’sfrequentresponsetogivingtheirfirstspeech:feel【T1】______【T1】______II.Thespeaker’ssecr
OnPublicSpeakingI.People’sfrequentresponsetogivingtheirfirstspeech:feel【T1】______【T1】______II.Thespeaker’ssecr
随机试题
某施工单位以总价合同的形式与业主签订了一份施工合同,该项工程合同总价款为600万元,工期从2013年3月1日起开工至当年8月31日竣工。合同中关于工程价款的结算内容有以下几项:(1)业主在开工前7天支付施工单位预付款,预付款为总价款的25%。(2)工程预付
防爆电气线路的敷设有严格的要求。下列关于防爆电气的敷设要求的说法中,错误的是()。
人力资源规划的最后一步是()
某企业欲长期控股某公司,现已知该公司去年普通股股利为4元,该企业预计该公司的普通股股利将持续地增长下去,估计年股利增长率为3%,而该企业的投资收益率也长期保持在12%,那么该企业能够接受该公司的股票价格为()
垂体前叶功能亢进可表现为
世界银行贷款项目的建设周期中各工作阶段的正确顺序是( )。
给定资料1.我国教育事业包括基础教育、职业教育和高等教育等多个部分。而基础教育又包括幼儿教育、小学教育、普通中学教育(初中、高中)。1949年以前,我国的教育事业十分薄弱,教育发展最高年的1946年,全国只有幼儿园1300所,小学28,9万所,中
侵犯的本能论的代表人物有()
某银行的资产负债表如下,其中,BL、ML分别是2.5年和30年期、按月偿还的商业抵押贷款;CD1是1年期一次性偿付的存单,CD5是5年期一次性偿付的存单,D是存续期。假定在本轮金融危机冲击下,该银行两类贷款均因违约率上升而减值50%,同时两类存款各流失
下列关于滚动条的叙述中,错误的是
最新回复
(
0
)