首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
46
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
According to the service people, ______ are(is) to take the responsibilities.
选项
A、they themselves
B、Howard Gerber
C、children
D、manager
答案
C
解析
转载请注明原文地址:https://www.kaotiyun.com/show/6WKd777K
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Whoisthetrainingprogramintendedfor?
Accordingtotheman,whatchangewillbemadetothecompany?
Whatwasthemanpreviouslyrequestedtodo?
Whatdepartmentdoesthespeakermostlikelyworkin?
Whatdoesthemansayabouttheresearch?
NegotiationYourcompanywilldobusinesswithanotherforeigncompany.Sinceitisthefirsttimetodobusinesswiththatc
Ismarketresearchimportantornot?Why?
Politecomplaints客气投诉
•Youwillhearanopeningkeynoteatthe2ndIT0utsourcingConference&Expo.•Asyoulisten,forquestions1—12,completethe
•Youwillhearanopeningkeynoteatthe2ndIT0utsourcingConference&Expo.•Asyoulisten,forquestions1—12,completethe
随机试题
下列属于水电站引水建筑物的有()。
A.普通光学显微镜B.暗视野显微镜C.倒置显微镜D.荧光显微镜E.电子显微镜为观察细胞的生长状况,适合选用的显微镜
H、受体阻断药可用于治疗
以下选项对会计凭证表述不正确的是()。
封闭式基金在证券交易所上市,其价格除取决于基金份额资产净值外,还受到市场供求状况、经济形势、政治环境等多种因素的影响,所以其价格与资产净值常发生偏离。()
下列关于上市公司公司债券投资者权益保护制度的表述中,符合证券法律制度规定的是()。
个体主观能动性在人发展中所起的作用为()。
按照马克思主义的观点,经济基础和上层建筑共同构成一个社会的()。
某市对52种建筑防水卷材产品进行质量抽检.其中有8种产品的低温柔度不合格,10种产品的可溶物含量不达标,9种产品的接缝剪切性能不合格,同时两项不合格的有7种,有1种产品这三项都不合格。则三项全部合格的建筑防水卷材产品有多少种?
设随机变量X1,X2,…,Xn(n>1)相互独立,均服从N(0,σ2),则=__________________
最新回复
(
0
)