首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every d
admin
2018-04-03
121
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1,172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀|) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
ETP hopes to finish this project in______.
选项
A、2016
B、2017
C、2018
D、2019
答案
A
解析
细节题。定位到文章第一段第二句“Energy Transfer Partners(ETP),a Tex—as-based company behind the $3.8 billion project,hopes to finish construction this year.”可知,ETP公司期望在今年内完成输油管道建设。由于本篇短文是2016年北京地区阅读理解的一道考题,所以选A。
转载请注明原文地址:https://www.kaotiyun.com/show/6SCO777K
0
成人本科学位英语
相关试题推荐
Fromherepeoplecanseethebridge______construction.
Haveyoueverseena______bagonthetable?
Saltisasnecessarytolifeaswater.InmanyareasofAfricapeopleoncedranktheurine(尿)ofanimalsbecausetheyhadnoothe
Dataprocessingisaseriesofoperationscarriedoutondatatogetinformation.【C1】______seriesofoperationsisalsocalledt
Peoplehavewonderedforalongtimehowtheirpersonalitiesandbehaviorsareformed.Itisnoteasytoexplainwhyoneperson
Throughoutthehistoryofthearts,thenatureofcreativityhasremainedconstanttoartists.Nomatterwhatobjectstheyselec
Recentlyquitealotofexperts______thatanotherlawonwildlifeprotection______assoonaspossible.
Inthe1960s,medicalresearchersThomasHolmesandRichardRahedevelopedachecklistofstressfulevents.Theyappreciatedthe
Manyyoungpeoplefindithardertoappreciate()musicthanpopmusic.
Whenhewassetfreeaftertwentyyearsinprison,hewasamazed()thechangedworldhefound.
随机试题
法约尔的统一指挥原则认为()
以下______不属于Internet服务。
低血糖症发作时的血糖小于
我国第一部炮制专著是
A.心气亢盛B.宗气外泄C.心阳不足D.心气衰竭E.心肺气绝
按分离机制TLC可分
已知图4-22所示结构中的q,L,则固定端B处约束力的值为(设力偶逆时针转向为正)()。
下列选项哪一项属于我国非政府组织开展的家庭工作?()
下列关于通货膨胀的再分配效应的说法,正确的是()。
Thisspecieshasnearly(diedout)becauseitshabitatisbeingdestroyed.
最新回复
(
0
)