首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
A broad public discussion of environmental problems began in the mid-1980s, when the first "green" groups formed in opposition
A broad public discussion of environmental problems began in the mid-1980s, when the first "green" groups formed in opposition
admin
2018-05-25
67
问题
A broad public discussion of environmental problems began in
the mid-1980s, when the first "green" groups formed in opposition
to Erevan’s intense industrial air pollution and to nuclear power
generation in wake of the 1986 reactor explosion at Chernobyl.【S1】______
Environmental issues helped form the basis of the nationalist
independence movement when environmental demonstrations
subsequently merged with these for other political causes in the【S2】______
late 1980s.
In independent Armenia, environmental issues divide society
into those who fear of "environmental time bombs" and those who【S3】______
view resumption of pollution-prone industrial operations as the only
mean of improving the country’s economy. In the early 1990s, the【S4】______
latter group blamed Armenia’s economic woes on a role played by【S5】______
the former in closing major industries.
In 1994 three national environmental laws were in effect: the
Law on Environmental Protection, the Basic Law on the
Environment, and the Law on Mineral Resources. The Council of
Ministers, Armenia’s cabinet, includes a minister of the
environment. Therefore, no comprehensive environmental protection【S6】______
program has emerged, and decisions on environmental policy have
been made on an ad hoc basis.
Environmental conditions in Armenia have been worsened by
the Azerbaijani blockade of supplies and electricity from outside.
The results of the blockade and the failure of diplomatic efforts to lift
it led the government propose reconstruction of the Armenian Atomic【S7】______
Power Station at Metsamor, which was closed after the 1988
earthquake because of its location in an earthquake-prone area and
what had the same safety problems as reactors listed as dangerous in【S8】______
Bulgaria, Russia, and Slovakia. After heating debates over startup【S9】______
continued through 1993, French and Russian nuclear consultants
declared operating conditions basically safe. Continuation of the
blockade into 1994 gave added emergency to the decision.【S10】______
【S8】
选项
答案
what一which
解析
关系代词误用。该句为定语从句,与and前面由which引导的定语从句并列,先行词同为the Armenian Atomic Power Station at Metsamor,故将what改为which。
转载请注明原文地址:https://www.kaotiyun.com/show/zeoK777K
0
专业英语八级
相关试题推荐
Today,Iamgoingtoidentifysometypicalresearchproblemsandalsosharewithyouthesolutionstotheseproblems.Thefirst
Today,Iamgoingtoidentifysometypicalresearchproblemsandalsosharewithyouthesolutionstotheseproblems.Thefirst
A、Federalgovernment.B、Individualpublicschools.C、Theeducationchief.D、Individualstatesanddistricts.D本题设题点在强调句处。根据句(1)可
A、Theyaretoobusyworking.B、Theyaren’tawareoftheimportanceofsleep.C、Theyhavesomehealthyproblems.D、Theydon’tthi
A、Thelessdiscussionthebetter.B、Themorediscussionthebetter.C、Youmayconsultparents.D、Youmayconsultanadvisor.D本题
PassageThreeWhatisthepublic’sfeelingtowardsgovernmentonpark-closingissue?
Oneoftheobviousproblemswithpredictingthefutureeffectsofclimatechangeisthattheyhaven’thappened.Thismakesclima
随机试题
下列哪项符合奥伦对自理概念的叙述
对劳动合同的变更和履行,下列说法错误的是。
某单位修建建筑面积为265m2的健身房,可以不申请办理施工许可证。[2006年考题]()
背景:某商业工程,建筑面积65000m2,地上8层,地下2层。筏板基础,地上为框架结构。某施工单位中标施工总承包,中标价2.56亿元人民币。质量目标:合格,施工单位成立了项目部,并于2010年12月15日进场。施工过程中发生了如下事件:
某钢铁厂原有高炉大部分为200m3以下,为了适应市场发展需求增加钢铁产量,在原有的4座高炉东1km处新建一座1080m3的炼铁高炉,占地约300亩。该工程主要包括:厂区道路、给排水系统、高炉热风炉本体及出铁场系统、上料系统、总渣水系统、铸铁机厂房等能源车间
针对基坑开挖、脚手架拆除而制定的计划或方案属于()。
新的养老保险制度实施以后参加工作的职工,如果个人缴费年限满()年,在退休后可按月领取基本养老金。
某县发生一起街头抢劫项链等财物的案件,经侦查逮捕了犯罪嫌疑人某甲,预审中甲否认有罪。在此期间,当地又发生一起作案手段相似的抢劫案,犯罪嫌疑人某乙被抓获。经讯问,乙对上述两起抢劫案供认不讳,并在其住宅搜出了被抢的金项链等物,经侦查辨认和鉴定,证明是被害人被抢
One-thirdofParentsLackFactsaboutChildDevelopmentOne-thirdofparentsofbabieshaveasurprisinglylowknowledgeof
Fortypeoplewerekilledina______ontherailwayyesterday.
最新回复
(
0
)