首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Art Murals Why is the class discussing the technical requirements of murals?
Art Murals Why is the class discussing the technical requirements of murals?
admin
2013-04-25
68
问题
Art Murals
Why is the class discussing the technical requirements of murals?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、They are preparing for an examination.
B、They plan to visit some famous murals.
C、They are helping to design a new building.
D、They will be creating their own mural.
答案
D
解析
The class will be creating their own mural. The instructor says I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. (2.3)
转载请注明原文地址:https://www.kaotiyun.com/show/ySyO777K
0
托福(TOEFL)
相关试题推荐
SECTION4Questions31-40Questions31-35Completethenotesbelow.WriteNOMORETHANTHREEWORDSorANUMBERforeachanswer.
PrairieDogbarkshave______meanings.PrairieDogsinArizonaandColoradoappeartospeakdifferent,butmutually-comprehens
PrairieDogbarkshave______meanings.PrairieDogsareabletoinvent______forthingstheyhaveneverseenbefore.
Whattimedoesthelibraryopen?WhenwillSaturday’sfootballtrialsprobablyend?
Completethenotesbelow.WriteONEWORDAND/ORANUMBERforeachanswer.Requirements:GoodliftaccessLargel
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
随机试题
病人为女性,62岁,身肿一月,以腰以下为甚,脘腹胀闷,纳呆便溏,面色萎黄,神倦,肢冷畏寒,尿少,舌淡苔白腻,脉沉弱。应辨证为
A.小儿急惊B.疔疮肿毒C.肝火上炎D.梅毒湿疹E.久疟疟母土茯苓的主治病症是()。
张某从甲省拐骗17岁少女1人,欲卖至乙省,在拐卖途中,张某几次强行奸淫该女,并强迫其卖淫两次,则张某的行为不应当认定为( )。
下列说法中不正确的为()。
制定管道焊接工艺指导书的依据是()。
某企业拟开发新产品。有三种设计方案可供选择,因不同的设计方案的制造成本、产品性能各不相同,在不同的市场状态下的损益制也各不相同。根据后悔值原则,该企业应该采取的方案是()。
储蓄机构的更名、迁址、撤并,应报经当地(),按规定程序批准后,方可正式对外公布。
公文的制发程序是()。
某教师评价学生的语文学习,既有课堂学习活动的测评,也有课外活动的参与态度、表现、效果的记录。对这一做法分析正确的是()。
Criticismandself-criticismisnecessary______ithelpsustocorrectourmistakes.
最新回复
(
0
)