首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
By saying "But in America, time is more than that"(Para. 1), the author thinks that the American______. When Americans are more
By saying "But in America, time is more than that"(Para. 1), the author thinks that the American______. When Americans are more
admin
2009-04-23
67
问题
By saying "But in America, time is more than that"(Para. 1), the author thinks that the American______.
When Americans are more than 10 minutes late to an appointment, they usually ______.
选项
答案
call for an apology, and maybe an explanation
解析
参见文章第3段第1句:To Americans,punctuality is a way of showing respect for other people’s time.Being more than 10 minutes late to an appointment usually calls for an apology,and maybe an explanation.
转载请注明原文地址:https://www.kaotiyun.com/show/wCZK777K
0
大学英语六级
相关试题推荐
Thispartistotestyourabilitytodopracticalwriting.Youarerequiredtowriteanoticeaccordingtotheinformationgiven
AnewpollshowsthatpeoplebelievethatcomputersandtheInternethavemadelifebetterforAmericans,butpeoplealsoseeso
Thispartistotestyourabilitytodopracticalwriting.Youarerequiredtowriteabusinessletteraccordingtothefollowin
A、English.B、Pre-schoolEducation.C、BusinessAdministration.D、Law.C女士在回答有何资历时明确提到她的专业是工商管理。
Howcanstudentsimprovetheirreadingspeed?Theymayimprovetheirreadingspeedwith______.
Itis(embarrass)______tobefoundstealingsomething.
WhenindustrybecamemoreimportantthanagricultureinthelifeofAmericanpeople,familiesbecamesmallerthaneverbefore.
Howhardisittogetbeautifulhair?Beautifulhaircannotbetakenforgranted.Environmentalfactors,chemicaltreatments
随机试题
如何排除蒸发器结霜现象?
利用JK触发器和逻辑门设计一个同步计数器,实现如题36图所示的状态转换。图Y为进位输出,要求写出各触发器的状态方程及驱动方程。(不要求画逻辑图)
简述消费者权益损害的赔偿责任主体。
在同一变量数列中,组距的大小与组数的多少之间的关系()
急性淋巴细胞白血病L2型,核仁最重要的特点是
患者,男,44岁。右下6缺失,行双端固定桥修复。固定桥试戴时,用力戴入后,邻牙出现胀痛。最可能的原因是
某冶建单位承接了某钢厂办公大楼工程。该工程紧临主要干道,施工场地比较狭窄。主体地上18层,地下2层,建筑面积32100m2,基础开挖深度7.5m,低于地下水位,为了确保整个工程的施工质量,按照“预防为主”的原则,施工单位加强每道施工工序的质量控制,工程最终
新课程教学要达到的三维目标分别是_____、______、情感态度与价值观。
北上广深等一线城市为缓解交通拥堵,准备收取交通拥堵费。有人赞成,认为收取交通拥堵费有利于缓解拥堵;有人反对,认为这不能从根本上解决问题。对此。你怎么看?
项目质量管理由质量计划编制、质量保证和(36)三方面构成。(37)是为使项目能够满足相关的质量标准而建立的有计划的、系统的活动。(36)
最新回复
(
0
)