首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
计算机
The entity-relationship (E-R) data model is based on a perception of a real world that consists of a collection of basic objects
The entity-relationship (E-R) data model is based on a perception of a real world that consists of a collection of basic objects
admin
2020-08-10
65
问题
The entity-relationship (E-R) data model is based on a perception of a real world that consists of a collection of basic objects, called(71),and of relationships among these objects. An entity is a “thing” or “object” in the real world that is distinguishable from other objects. Entities are described in a database by a set of (72) . A relationship is an association among several entities. The set of all entities of the same type and the set of all relationships of the same type are termed an entity set and relationship set, respectively. The overall logical structure (schema) of a database can be expressed graphically by an E-R diagram, which is built up from the following components: (73) represent entity set, (74) represent attributes, etc. In addition to entities and relations, the E-R model represents certain(75)to which the contents of a database must conform. The entity-relationship model is widely used in database design.
(73)
选项
A、rectangles
B、ellipses
C、diamonds
D、lines
答案
A
解析
转载请注明原文地址:https://www.kaotiyun.com/show/v5TZ777K
本试题收录于:
数据库系统工程师上午基础知识考试题库软考中级分类
0
数据库系统工程师上午基础知识考试
软考中级
相关试题推荐
(2008下系分)UML用关系把事物结合在一起。_______(1)描述一个事物发生变化会影响另一个事物的语义。_______(2)描述特殊元素的对象可替换一般元素的对象。(1)
(2012上项管)入侵检测通过对计算机网路或计算机系统中的若干关键点收集信息并进行分析,发现网络系统中是否有违反安全策略的行为和被攻击的迹象。进行入侵检测的软件和硬件的组合就构成了入侵检测系统。______是入侵检测系统的核心。
(2013下集管)(2009下架构)一个大型软件系统的需求通常是会发生变化的。以下关于需求变更策略的叙述中,错误的是______。
(2007下系分)UML采用4+1视图来描述软件和软件开发过程,其中_____(1)描绘了所设计的并发与同步结构;_____(2)表示软件到硬件的映射及分布结构;UML中的类图可以用来表示4+1视图中的_____(3)。(3)
(2009下架构)面向对象的设计模型包含以______(1)表示的软件体系结构图,以______(2)表示的用例实现图,完整精确的类图,针对复杂对象的状态图和用以描述流程化处理的活动图等。(2)
(2006下项管)项目范围说明书(初步)列出了项目及其相关产品、服务的特性和______以及范围控制和接受的方法。
(2014下集管)某公司与客户签定了一个系统集成项目合同,对于项目的范围和完成时间做出了明确的规定。在制定进度计划时,项目经理发现按照估算的活动时间和资源编制的进度计划无法满足合同工期,为了达到合同要求,项目经理不宜采用的方法是______。
(2013上项管)某设备由10个元件串联组成,每个元件的失效率为0.0001次/小时,则该系统的平均失效间隔时间为______小时。
In object-oriented(51), objects can be viewed as reusable components, and once the programmer has developed a(52)of these compon
Theentity-relationship(E-R)datamodelisbasedonaperceptionofarealworldthatconsistsofacollectionofbasicobjects
随机试题
限制进口技术的技术审查应包括的内容是
点M沿轨迹OAB运动,其中OA为一条直线,AB为四分之一圆弧。在已知轨迹上建立自然坐标轴,如图所示,设点M的运动方程为s=t3一2.5t2+t+10(s的单位为m,t的单位为s),则t=1s、3s时,点的速度和加速度大小计算有误的一项为()。
计算定积分xarcsinxdx.
下述哪种化疗是目前治疗NHL最常用的
A.高度水肿随体位而变化B.水肿指压凹陷不明显C.限于眶周D.体腔积液甚为少见E.水肿从踝部开始单纯性肾病的水肿
影响血药浓度的生理因素包括
通过沪港通交易取得的下列收入中,免征营业税的有()。
设矩阵则矩阵A的秩为[].
程序性知识
一个随机选择的购物者回答一份营销调查问卷中的问题。6个月以后,另一个随机选择的购物者回答相同的问题,只是这些问题被安排成了不同的次序。两者对许多单个问题的答案有很大不同,由此显示出一个问题有时会得到不同的回答仅仅取决于哪一个问题在它前面。上面的结论是基于下
最新回复
(
0
)