首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
公务员
Imagine, one day, getting out of bed in Beijing and being at your office in Shanghai in only a couple of hours, and then, after
Imagine, one day, getting out of bed in Beijing and being at your office in Shanghai in only a couple of hours, and then, after
admin
2011-02-02
54
问题
Imagine, one day, getting out of bed in Beijing and being at your office in Shanghai in only a couple of hours, and then, after a full day of work, going back home to Beijing and having dinner there.
Sounds unusual, doesn’ t it? But it’ s not that unrealistic, with the development of China’ s high-speed railway system. And that’ s not all. China has an even greater high-speed railway plan to connect the country with Southeast Asia, and eventually Eastern Europe.
China is negotiating to extend its own high-speed railway network to up to 17 countries in 1 0 to 15 years, eventually reaching London and Singapore.
China has proposed three such projects. The first would possibly connect Kunming with Singapore via Vietnam and Malaysia. Another could start in Urumqi and go through Kazakhstan and Uz-bekistan, and possibly to Germany. The third would start in the northeast and go north through Russia and then into Western Europe.
If China’ s plan for the high-speed railway goes forward, people Could zip over from London to Beijing in under two days.
The new system would still follow China’ s high-speed railway standard. And the trains would be able to go 346 kilometers an hour, almost as fast as some airplanes.
China’s bullet train(高速客车), the one connecting Wuhan to Guangzhou, already has the World’ s fastest average speed, It covers 1,069 kilometers in about three hours.
Of course, there are some technical challenges to overcome. There are so many issues that need to be settled, such as safety, rail gauge (轨距), maintenance of railway tracks. So it’s important to pay attention to every detail.
But the key issue is really money. China is already spending hundreds of billions of yuan on domestic railway expansion.
China prefers that the other countries pay in natural resources rather than with capital investment. Resources from those countries could stream into China to sustain development.
It’ll be a win-win project. For other countries, the railway network will definitely create more opportunities for business, tourism and so on, not to mention the better communication among those countries.
For China, such a project would not only connect it with the rest of Asia and bring some much-needed resources, but would also help develop China’ s far west. We foresee that in the coming decades, millions of people will migrate to the western regions, where the land is empty and resources unused. With high-speed trains, people will set up factories and business centers in the west once and for all. And they’ 11 trade with Central Asian and Eastern European countries.
According to the passage , the greatest challenge to the new high-speed railway plan is______.
选项
A、technical issues
B、safety of the system
C、financial problems
D、maintenance of railway tracks
答案
C
解析
由倒数第四段中的第一句可知这个项目最大的挑战就是资金问题。故 选C。
转载请注明原文地址:https://www.kaotiyun.com/show/tB6q777K
本试题收录于:
中学英语题库教师公开招聘分类
0
中学英语
教师公开招聘
相关试题推荐
在解决具体的物理问题时,通常运用不同的解决方法,如把研究对象或物理过程分隔成许多小块或若干个小片段、小过程来加以研究,这种方法是()。
小强和同学一起设计了“风力测试仪”的原理图,如图所示,已知电源电压为12V,R0为20Ω,OB长为10cm,AB是长为20cm、阻值为60Ω的均匀电阻丝。OP为质量、电阻均不计的金属细杆,下端连接一个重为3N的圆球P。金属细杆OP始终与电阻丝AB接触良好且
新课程理念下教师的角色发生了变化。已有原来的主导者转变成了学生学习活动的______,学生探究发现的______,与学生共同学习的______。
Fromthehealthpointofviewwearelivinginamarvelousage.Weareimmunizedfrombirthagainstmanyofthemostdangerousd
Oneafternoon,mysonAdamaskedme,"Areallpeoplethesameeveniftheyaredifferentincolor?"Ithoughtforaminute,
Themajorityofpeopleinthetownstrongly______theplantobuildaplaygroundforchildren.
Writethearticle.Runforclasses.Haven’tfinishedthereadings.Housecleaning.Assignmentto【C1】______intwohours.Outofb
Writethearticle.Runforclasses.Haven’tfinishedthereadings.Housecleaning.Assignmentto【C1】______intwohours.Outofb
deeply
随机试题
背景天津某工程由A建筑集团公司总承包,土方由B基础公司分包,现场正在进行深基坑土方开挖。18点15分,B基础公司项目经理将11名普工交给现场工长;19点左右,工长向11名工人交代了生产任务,11人全部下基坑,在⑦轴至⑧轴间平台上施工(领班未到现场,电工未
A.患肢短缩、纵向叩击痛、外旋45°~60°B.患肢屈曲、外展、外旋畸形C.患肢短缩、纵向叩击痛、外旋90°D.患肢屈曲、内收、内旋畸形髋关节前脱位会出现
女性,38岁,G2P0,痛经渐进加重5年。患者月经规律,5/28天,量中。自5年前人流后开始痛经,以下腹部为重,放射至肛门及大腿,患者最可能的诊断是
A.双缩脲反应B.Vitali反应C.绿奎宁反应D.甲醛硫酸反应E.NO3-的反应芳环侧链具有氨基醇结构的药物的特征反应
下列哪项不属于施工图预算的编制方法()。
采用直接标价法时,一国汇率的上升意味着()。
系统管理密码和数据库管理密码应分开管理,但可有同一人掌管。()
我国和一些国际组织对导游服务实行规范化的主要目的是为了()。
幼儿园教育的原则有()。
设曲线L是抛物柱面x=2y2与平面x+z=1的交线.求曲线L分别绕各个坐标轴旋转一周的曲面方程.
最新回复
(
0
)