首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Problem Description of the Flood Early Warning System Vocabulary and Expressions physically-based algorithm deploy
Problem Description of the Flood Early Warning System Vocabulary and Expressions physically-based algorithm deploy
admin
2018-06-10
99
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse
The scientists are testing how to distribute and adapt the flood prediction calculation.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
该表述是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:https://www.kaotiyun.com/show/smrO777K
本试题收录于:
CATTI三级口译综合能力题库翻译专业资格(CATTI)分类
0
CATTI三级口译综合能力
翻译专业资格(CATTI)
相关试题推荐
WhatadifferenceKathleenmadeinmycollegelife!ShewasconfidentwhereIwasshaky.ShewasdisciplinedwhileIwaswild.S
FormanyyearsitwascommonintheUnitedStatestoassociateChineseAmericanswithrestaurantsandlaundries.Peopledidnot
Inthedevelopingnations,thetechnologyhasthecapacitytoreachteachersinremoteandeducationally______areasandhopefu
TheFederalGovernment联邦政府TheConstitutionWhenAmericabrokeawayfromBritainin1775,she
EgyptianVillages埃及村落Mostoftheinhabitantsliveinmud-brickhomes,their(1)wallsinsulatingagainsttheafternoonhe
CustomsofBulgaria:MarriageandFamily保加利亚习俗:婚姻与家庭Theaverageageforwomentomarryisbetween18and25.25tendto(1)
CustomsofBulgaria:MarriageandFamily保加利亚习俗:婚姻与家庭Theaverageageforwomentomarryisbetween18and25.25tendto(1)
WhenPresidentKennedyspokeinBerlinfrombehalfoftheAmericanpeople,hewasreceivedwithashowofenormousenthusiasm.
TheAmericanAcademyofPediatrics(AAP)justreleaseditsupdatedguidelinesforchildren’smediause.Therecommendationsr
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternationalMonetaryFundmacro-economicfundamentals
随机试题
型式评价大纲的编制应依据哪个计量技术规范?
患者女,56岁。因“颈肩疼痛伴左下肢酸痛无力1个月”来诊。查体:C4~6棘突旁压痛(+),椎间孔挤压试验(±),双侧霍夫曼征(+);双膝腱反射活跃,右下肢肌张力增高。舌暗有瘀斑,苔薄白,脉弦涩。本病的中医辨证分型为
被称为“活校”的是()。
逃生缓降器、逃生梯、应急逃生器、逃生绳供人员逃生的开口下沿距所在楼层地面高度应在()m以上。
从用户的观点看,操作系统是()
最容易引起骨折不连接的移位是()。
诊断丹毒最有意义的临床表现是
收局阶段是一项交易谈判的最后阶段,即谈判终局。判断谈判终结的准则有:()。
住宅套内楼梯踏步最小宽度和最大高度,正确的是()。
根据《建设工程监理规范》,结合工程项目特点制定的监理工作程序中,应明确()。
最新回复
(
0
)