Which Low Carbon Technology Is Now a Reality? A)With fossil fuels expected to supply over 70% of the world’s energy needs by 204
Which Low Carbon Technology Is Now a Reality? A)With fossil fuels expected to supply over 70% of the world’s energy needs by 204
admin
2016-03-08
39
问题
Which Low Carbon Technology Is Now a Reality?
A)With fossil fuels expected to supply over 70% of the world’s energy needs by 2040, we face some urgent questions: where should efforts be focused in reducing greenhouse gas emissions? Which technologies hold the most promise? There are a range of low-carbon solutions and given the challenge, we will need them all. We hear a lot about the advances being made by refreshable sources of energy such as solar, wind and hydro-electricity and these are certainly valuable technologies in combating climate change. But how can we really make a major impact in reducing carbon emissions from large power plants and industrial facilities? Enter carbon capture and storage—or CCS—a technology that captures CO
2
from fossil fuel production and permanently stores it underground.
B)The aim is to prevent the release of large quantities of CO
2
into the atmosphere(from fossil fuel use in power generation and other industries). It is a potential means of relieving the contribution of fossil fuel emissions to global warming and ocean acidification(酸化). Although CO
2
has been injected into geological formations for several decades for various purposes, including enhanced oil recovery, the long term storage of CO
2
is a relatively new concept. The first commercial example was Weyburn in 2000. CCS can also be used to describe the scrubbing(涤气)of CO
2
from environmental air as a climate engineering technique.
C)In November 2014 the Global CCS Institute released its flagship(核心的)publication—the annual Global Status of CCS report. This comprehensive annual update is the prominent source of information on the development of CCS around the world. A lot of work went into updating information in the report, in cooperation with the CCS industry, as there had been quite significant changes to the CCS landscape in the preceding 12 months. This included the launch of a large-scale CCS project in the power sector and the beginning of construction of the world’s first large-scale CCS project in the iron and steel sector.
D)Large-scale CCS is now a reality in the power sector with the October 2014 launch of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project in Saskatchewan, Canada. Boundary Dam is the first commercial, CCS plant in the power sector, removing 90 per cent of the CO
2
produced by electricity generation from lignite(褐煤)coal at Production Unit No. 3 of the SaskPower facility. The captured CO
2
is primarily used for enhanced oil recovery(EOR)at the nearby Weyburn oil field, although amounts are also to be stored in deep geological formations at the Aquistore site. The success of the Boundary Dam project and the progression of additional projects through planning and construction, indicates that CCS technologies for application in the power sector are " market ready".
E)The next 18 - 24 months will see CCS be applied across a range of industries and storage types. A further two large-scale CCS power projects are in construction in the US—the Kemper County Energy Facility in Mississippi and the Petra Nova Carbon Capture Project in Texas. Both projects are expected to be operational in 2016. Also in the US, the Illinois Industrial CCS project planned for launch later this year will capture CO
2
from the Archer Daniels Midland corn-to-ethanol(乙醇)plant in Decatur, Illinois for storage in an onshore deep saline formation. The Abu Dhabi CCS project in the United Arab Emirates is under construction and from 2016 will provide the world’s first large-scale demonstration of CO
2
capture from iron and steel production.
F)In addition to the 22 large-scale CCS projects currently in operation or construction around the world, 14 projects are in advanced stages of planning, many of which are likely to be in a position to make a final investment decision over the coming year. Together this group of projects covers a range of applications for CCS and could extend to around ten in the number of large-scale CCS projects operating in the power sector by the end of the decade. Their progression to operation would add experience in the dedicated geological storage of CO
2
and see operational large-scale CCS activity extend to China for the first time.
G)2014 saw commercial application in the power sector become a reality and we can look forward to a further expansion across a diverse range of industries in the coming years. The Global CCS Institute continues to cover developments in CCS with up-to-date information, expert insights, workshops, media releases and online seminars. We struggle to make CCS industry information easily accessible and encourage you to engage with us via our website and regular publications.
H)For detailed information on large-scale CCS projects please visit our online Projects page, which you can browse or search for projects based on stage, region, industry or capture, transport and storage type. For the first time the Institute’s website contains project descriptions for around 40 lesser scale "remarkable" CCS projects, of which four Japanese "remarkable" CCS projects were the key focus of a chapter in the Global Status of CCS report. For ongoing expert information visit our Insights page, which is regularly updated with articles from experts in carbon capture and storage, public engagement, legal issues and policy developments.
I)To join in the discussion you can attend meetings and workshops around the world, and participate in online seminars where you will have the opportunity to listen to and ask questions of a range of experts. Visit our Events page to see upcoming meetings, conferences, workshops and seminars. Finally, for a range of up-to-date news and more detailed information, visit our news and publications sections. We look forward to covering this exciting period in the development of CCS and providing you with the latest information and important issues for the sector.
A final investment decision on many projects in the planning stages is likely to be made within the next year.
选项
答案
F
解析
转载请注明原文地址:https://www.kaotiyun.com/show/rLe7777K
0
大学英语四级
相关试题推荐
Learningtoplayamusicalinstrumentcanchangeyourbrain,withaUSreviewfindingmusictrainingcanleadtoimprovedspeech
Learningtoplayamusicalinstrumentcanchangeyourbrain,withaUSreviewfindingmusictrainingcanleadtoimprovedspeech
Learningtoplayamusicalinstrumentcanchangeyourbrain,withaUSreviewfindingmusictrainingcanleadtoimprovedspeech
It’swellknownthatbiganimals,likepolarbears,aresensitivetoclimatechange.TheEarthwarms,polarice【B1】______,andt
It’swellknownthatbiganimals,likepolarbears,aresensitivetoclimatechange.TheEarthwarms,polarice【B1】______,andt
It’swellknownthatbiganimals,likepolarbears,aresensitivetoclimatechange.TheEarthwarms,polarice【B1】______,andt
It’swellknownthatbiganimals,likepolarbears,aresensitivetoclimatechange.TheEarthwarms,polarice【B1】______,andt
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Evenifallthereactorsinexistencewerecompletelys
A、Thechangingofweather.B、Thehealthofteenagers.C、Energydrinksandtheirnutrition.D、Thedangerofenergydrinks.D短文先用天
随机试题
请把下图给出的DES迭代过程中第i次迭代运算的结构图填写完整。
5岁女童,因患水痘目前发热39℃,此患儿忌用
下列哪项不是手术流产的禁忌证
卡马西平为
关于tRNA二级结构的叙述,不正确的是
女性,38岁,患慢性支气管炎、阻塞性肺气肿、肺源性心脏病,神志清楚,发绀明显,动脉血气提示代偿性呼吸性酸中毒,给予鼻导管吸氧4升/分,发绀略有减轻,但迅速进入嗜睡状态。此时首先应采取的措施是
某工程,签约合同价为25000万元,其中暂列金额为3800万元,合同工期24个月,预付款支付比例为签约合同价(扣除暂列金额)的20%,自施工单位实际完成产值达4000万元后的次月开始分5个月等额扣回。工程进度款按月计算,项目监理机构按施工单位每月应得进度款
下列不属于评定练习负荷强度的指标是《)。
根据我国立法法规定,省、自治区、直辖市的人民代表大会制定的地方性法规的公布机构是()。
给定程序MODll.c中函数fun的功能是:找出一个大于形参m且紧随m的素数,并作为函数值返回。请改正程序中的错误,使它能得出正确的结果。注意:不要改动main函数,不得增行或删行,也不得更改程序的结构!#includeintf