首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season bec
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season bec
admin
2022-09-09
430
问题
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________, so are expensive
Need to use sunlight to prevent local plants from【L33】________Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________for the roof)
Building and maintenance done by local craftsmen Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________have greater opportunities
More children are educated
【L33】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low
. In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter
, which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter
. And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful
. The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap
. Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering
. In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone
, there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on
. They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities
. They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
freezing
解析
空格前为prevent from结构,推测应填入一个名词。录音原文中的protect...from...是题目prevent...from...的同义替换,locally produced plants是local plants的同义替换,故空格处填入freezing。
转载请注明原文地址:https://www.kaotiyun.com/show/YBnD777K
本试题收录于:
雅思听力题库雅思(IELTS)分类
0
雅思听力
雅思(IELTS)
相关试题推荐
给定程序MODI1.C中fun函数的功能是:将p所指字符串中每个单词的最后一个字母改成大写。(这里的“单词”是指由空格隔开的字符串)。例如,若输入“Iamastudenttotaketheexamination.”,则应输出“Ia
计算机数据库管理系统中的核心问题是()。
下列给定程序的功能是:读入一个英文文本行,将其中每个单词的第一个字母改成大写,然后输出此文本行(这里”单词”是指由空格隔开的字符串)。例如,若输入”Iamastudenttotaketheexamination”,则应输出”IAmASt
请使用VC6或使用【答题】菜单打开考生文件夹proj3下的工程文件proj3。本题创建一个小型字符串类,字符串长度不超过100。程序文件包括proj3.h、proj3.cpp、writeToFile.obj。补充完成proj3.h,重载+运算符。要求:
Whatistheprobablerelationshipbetweenthetwospeakers?
Whatdothespeakersagreeabouttakingthetrain?
Youmightbesurprisedtoknowthatbicycleshaveexistedforabouttwohundredyears,butnooneissurewhofirstmadethispo
Whydoesthemanpostponetheproject?
WhichTWOproblemsdoGroverandthetutoridentifyconcerninggroupassignments?APersonalrelationships.BCultural
WhichTWOthingscanvisitorsdoatthemuseum?Abuyhome-madebreadBrideahorseCrideonatramDbuy
随机试题
删除表的语句为:
如何正确理解社会主义社会的民主?
Theyear2000willbringbigchangesincommunication.Cellphoneswillbesmallenoughtocarryinyourpocket.Videophoneswil
尿路结石气结证的治法()
头颈部肿瘤放疗前应做的常规准备中,哪项可以除外
慢性子宫颈炎病理变化中,最常见的是( )。
单位工程的现场节能抽样检测应合格,检测数量集中小区内相同类型的建筑物不得低于样本总数的20%,最少应检测3幢。()
某上市公司2011年底流通在外的普通股股数为1000万股,2012年3月31日增发新股200万股,2012年7月1日经批准同购本公司股票140万股,2012年的净利润为400万元,派发现金股利30万元,则2012年的每股收益为()元。
某仓库近期有8400件计算机显示器到库,单件外形尺寸为:60cm×60cm×60cm,重50kg,外包装标示的堆码极限标志为6,问需要为此批货物准备多大的货位?其储存定额是多大?若该批显示器全部存放在一个使用面积为650m2的仓库中,问该仓库的面积利用
利他行为:指人们出于自愿、不指望任何报酬的帮助他人的行为。下列属于利他行为的是()。
最新回复
(
0
)