首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Between what times is the road traffic lightest? What will be the extra cost of modifying houses?
Between what times is the road traffic lightest? What will be the extra cost of modifying houses?
admin
2009-05-13
72
问题
Between what times is the road traffic lightest?
What will be the extra cost of modifying houses?
Good afternoon. I’m Paula Bundell and I am giving you the lectures on Environmental
Noise this term. Today we are going to look into the effects of noise on a planned housing
estate in a particularly difficult part of the new Manchester Park area.
This site is not as bad as some I have researched in the past. The Blacktown airport is
closed from 6pm to 7am and this is a great advantage to the site. The only noise after dark
is from the highway and the traffic is somewhat reduced between 7.30pm and 5.30am. 【Q31】
So, the people most affected by the noise will be, I expect, housewives. By the time most of 【Q32】
the students and workers have arrived back home in the evening during the week the noise
will have abated to a fairly large extent. The weekends are still a problem of course, but the
traffic is certainly reduced on Saturdays to a large extent and even more so on Sundays. 【Q33】
Of course modifications to houses will be necessary at a site like this and they come at a
significant cost to the developer and home buyer. The modifications I am about to outline
will add about $25,000 to the price of a newly-built house. That will still mean a cheaper 【Q34】
house than in a less noisy and more desirable area.
A bit of background would not go astray. I understand that you are all familiar with the
proposed development site at Manchester Park.
It’s a particularly difficult one in terms of noise with the highway along the eastern
perimeter and the Blacktown airport not 3 kilometres away to the north.
Of course, those nearest the highway will be the worst hit, with heavy traffic noise as
well as the noise from the light planes overhead. As you all know, the normal noise
threshold for private housing is 55 decibels. At this site the levels have been recorded as 【Q35】
high as 67 decibels.
The construction of the houses has to be somewhat modified from houses in most areas. In
the houses on the highway and in the noisiest areas of this site there will be a need for
specialised double glazing and special acoustic seals will have to be fitted to the doors. 【Example】
All exterior doors in this especially noisy pocket will have to be solid core wood doors with
hinges. Every house built on this site, not just those adjacent to the highway or nearest to
the airport, will require high density insulation materials in the roof. Not only will all the
roofs need insulating, the exterior walls will be required to be double brick. All ceilings will 【Q36】
require double thickness plaster board to be used in the construction. In the noisiest areas
mechanical ventilation will have to be installed in the exterior walls. In those areas with 【Q37】
sealed windows it will be necessary to fit fans with absorbers to cut out the noise in those
particular houses. Air conditioning units could also be fitted in the ceilings of such houses 【Q38】
but this is substantially more expensive than fans, and may not be needed on this site.
Coming back now to the double glazing I mentioned before. Specialised double glazing
requires a larger air gap between the inner and outer glass than normal double glazing.
The gap must be at least 7 centimetres. The thickness of the glass is also a factor, 8 【Q39】
millimetres on the outside and 6 on the inside pane. It is essential that the glass be thicker
on the outside than on the inside and that the gap between the panes of glass be a
minimum of 7 centimetres.
Obviously, the noise factor will have to be taken into consideration with the layout of
the houses. Living areas will have to be designed at the back of the houses away from the
highway. Bedrooms and living rooms will have to be built towards the back, and for those 【Q40】
houses closest to the highway two layers of plasterboard will be needed for the interior
bedroom walls. Those rooms constructed at the front of the houses should be garages,
laundries, kitchens, bathrooms and dining rooms.
I have come to the conclusion that this development should go ahead, but with various
acoustic modifications according to the position of the block in relation to the highway
and intersection.
选项
答案
(about) $25,000/twenty-five thousand dollars 【NOT 25,000】
解析
转载请注明原文地址:https://www.kaotiyun.com/show/UQAO777K
本试题收录于:
雅思听力题库雅思(IELTS)分类
0
雅思听力
雅思(IELTS)
相关试题推荐
Puttingacashvalueontheecologicalservicesprovidedbynature—suchasthewaterfiltration"service"providedbyaforested
Thatpeople______themusicalfeaturesofbirdsongssuggeststhatdespitethevastevolutionarygulfbetweenbirdsandmammals,s
Inherstartlinglyoriginalwriting,shewentfurtherthananyothertwentieth-centuryauthorinEnglish(perhapsinanylanguage
UnlikeColin,whose(i)______fordramaticpresentationcaptivatedhisaudiences,Nickwasnot(ii)______speaker.
Asadebater,Lennywassomethingofa______inthatheoftenusedsubtlydeceptivereasoningtowinpoints.
Thoughusually(i)______inherpraise,theteacherwas(ii)______inacknowledgingChandra’sachievements:shecouldnotsayenou
Followingthedecreebanning(i)______acts,suspected(ii)______couldbeforciblydetainedwithoutthefilingofformalcharges
SandraGilbertandSusanGubar’srecentbookpresentsa______ofdetail,providingfarmoreinformationthanonecaneasilydige
Althoughspecificconcernsmaydeterminetheintentofaresearchproject,itsresultsareoften____.
CarlaL.Peterson’sDoersoftheWord(1997),astudyofAfricanAmericanwomenspeakersandwritersfrom1830-1880,isanimpor
随机试题
砂轮架移动对工作台移动的垂直度,不属于磨床直线运动精度。()
下列哪项不属于牙的功能
采集血细菌培养标本时,血量宜为
下列各项,属于刑事责任的承担方式是( )。
剧院、电影院、礼堂、体育馆等人员密集场所,观众厅内疏散走道净宽度不小于()。
甲公司和乙公司为两个互不关联的独立企业,合并之前不存在投资关系。2012年3月1日,甲公司和乙公司达成合并协议,约定甲公司以固定资产作为合并对价,取得乙公司80%的股权。合并日,甲公司固定资产的账面原价为840万元,已计提折旧160万元,已提取减值准备40
元代是我国杂剧繁荣发展的时代,其中《西厢记》杂剧表现出的舞台艺术的完整性,达到了元代戏曲创作的最高水平。他的作者是()。
戊戌维新失败的主观原因主要是()
【B1】【B9】
ancientRome
最新回复
(
0
)