首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season bec
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season bec
admin
2022-09-09
72
问题
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________, so are expensive
Need to use sunlight to prevent local plants from【L33】________Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________for the roof)
Building and maintenance done by local craftsmen Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________have greater opportunities
More children are educated
【L38】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low
. In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter
, which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter
. And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful
. The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap
. Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering
. In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone
, there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on
. They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities
. They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
site
解析
空格前为形容词suitable,推测应填入一个名词。录音原文中指出,家庭中必须要有一处合适的场所可供建造(suitable for constructing it on)。录音原文中的which is suitable for与题目中的who have a suitable为同义替换,故空格处填入site。
转载请注明原文地址:https://www.kaotiyun.com/show/SBnD777K
本试题收录于:
雅思听力题库雅思(IELTS)分类
0
雅思听力
雅思(IELTS)
相关试题推荐
对长度为n的线性表排序,在最坏情况下,比较次数不是n(n-1)/2的排序方法是( )。
已知枚举类型定义语句为:enumToken{NAME,NUMBER,PLUS=5,MINUS,PRINT=10};则下列叙述中错误的是()。
请在考生文件夹下选择相应的命令,并按题目要求完成下面的操作。具体要求如下:注意:下面出现的所有文件都必须保存在考生文件夹下。在考生文件夹下的“Acc1.mdb”数据库中已建立“职工”和“部门”两张表。试按以下要求完成表的各种操作:(1)设置表对象“职
在考生文件夹中有“student.mdb”数据库。(1)将考生文件夹中的“成绩.xls”导入数据库,选课ID为主键,表的名字为“成绩”。(2)按照下表所示要求修改“成绩”表的设计,成绩字段的有效性规则是>=0And<=100。
销售部助理小王需要针对2012年和2013年的公司产品销售情况进行统计分析,以便制订新的销售计划和工作任务。现在,请按照如下需求完成工作:根据“订单明细”工作表中的销售记录,分别创建名为“北区”、“南区”、“西区”和“东区”的工作表,这4个工作表中分别
Whydoestheideaofprogressloomsolargeinthemodernworld?Surelybecauseprogressofaparticularkindisactually【C1】___
Whatistheproblem?
Whatdoesthespeakersuggestthecompanydo?
A、Followingclassroominstructions.B、Watchingplentyofmoviesonline.C、Breakingdownculturalbarriers.D、Backpackingaround
Teamworkplaysanimportantpartinourdailylifeandwork,butsometimesproblemswillarisewhenweareteamingup.Istillr
随机试题
考生文件夹下存在一个数据库文件“samp2.mdb”,里面已经设计好表对象“tStud”、“tCourse”、“tScore”和“tTemp”。试按以下要求完成设计:(1)创建一个查询,查找没有先修课程的课程,显示与该课程有关的学生的“姓名”、“性别”、
患儿,男,8岁。因“低热、干咳、疲乏、食欲减退3周入院”。患儿于3周前无明显诱因出现低热,最高体温38.1℃,夜间易出汗,间中咳嗽、无痰。家中祖父有结核病病史,患儿未接种卡介苗。该患儿最可能的临床诊断是什么
A.颧弓的后续部分B.鼓鳞裂C.蝶骨嵴D.以薄骨板和颅中窝相隔E.关节结节颞下颌关节关节窝前界
QA计划主要包括
开展房源营销时,下列不属于遵循的原则是()。
某面粉加工厂的面粉碾磨车间为3层钢筋混凝土结构建筑,建筑高度为25m,建筑面积共3600m2。根据生产的火灾危险性分类标准,该面粉碾磨车间的火灾危险性类别应确定为()。
在使用第二手统计数据时,应注意的事项有()。
注册会计师在识别和评估重大错报风险时所实施的审计程序包括()。
文化的边界从来是不确定的,主流文化也从来不是_______的对象,它是在吸收、协调和融合各种社会文化的基础上形成的。所谓主流文化不仅是时代的产物,是意识形态运作的结果,它还与一定的社区人群、阶级、文化习惯和传统相_______。填入划横线部分最恰
设随机变量X~U(0,1),在X=x(0<x<1)下,Y~U(0,x).(1)求X,Y的联合密度函数;(2)求Y的边缘密度函数.
最新回复
(
0
)