首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Art Murals The instructor briefly explains how moisture damages a mural. Indicate whether each sentence below is a part of the
Art Murals The instructor briefly explains how moisture damages a mural. Indicate whether each sentence below is a part of the
admin
2013-04-25
83
问题
Art Murals
The instructor briefly explains how moisture damages a mural. Indicate whether each sentence below is a part of the process. For each sentence, click in the correct box.
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
答案
Yes: Moisture seeps through the wall and dissolves salts in the wall material: When water leaks through a wall, it may dissolve the salts that are in the building materials. No: The plaster dries more quickly than the paint: Not mentioned in the discussion. No: An air space between the interior and exterior walls insulates the mural: ...an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture Yes: Dried salt deposits form a white film on the mural: When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. (2.6)
解析
转载请注明原文地址:https://www.kaotiyun.com/show/NSyO777K
0
托福(TOEFL)
相关试题推荐
SECTION2Questions11-20Questions11-13Completethetablebelow.WriteNOMORETHANTHREEWORDSORANUMBERforeachanswer
【21】Michalpointsoutthatnon-nativespeakerstudentscanuse______andbodylanguagetoindicatewhentheyarereadytoadd
SECTION3Questions21-30Questions21-23CompletethenotesonwhatMikasaysatthebeginningofthediscussion.Mikasays
SECTION1Questions1-10Questions1-4Selectthecorrectanswerfromthechoicesgiven.WriteA,B,CorDonyouranswershe
Thingsthatseemexcitingandfascinatingcanlaterseem______accordingtoAliandJatinder.The______mayalsohaveinforma
Questions26-30CompletethefollowingsentencesusingNOMORETHANTHREEWORDSforeachanswer.
Completethenotesbelow.WriteONEWORDAND/ORANUMBERforeachanswer.Requirements:GoodliftaccessLargel
Thefollowingareessentialrequirementsforwhichjobs?Writethecorrectletter,A,BorC,nexttoquestions11-15.
Thefollowingareessentialrequirementsforwhichjobs?Writethecorrectletter,A,BorC,nexttoQuestions11-15.Essential
ForestryForestFireListenagaintopartofthetalk.Thenanswerthequestion.Whatdoestheinstructormeanbythisstatemen
随机试题
Whydoesthemanneedamap?
在瑙基耶尔(Raunkiaer)的生活型分类中,芦苇属于隐芽植物。
女性,45岁,不明原因的低热、乏力半年,间歇性无痛性肉眼血尿两周,查体:体温:37.5℃,血压:140/90mmHg,余未发现异常,最合理的诊断为
患者小便混浊如膏如脂,带甜味,尿频量多,头晕耳鸣,腰脊酸软,多梦遗精,下肢无力,口咽干燥,舌质红,脉沉细而数。其治法是
[2004年第6题]总概算除包括工程建设其他费用、预备费外,还应包括下列哪一项费用?
一单层单跨有吊车厂房,平面如图38—40(Z)所示。采用轻钢屋盖,屋架下弦标高为6.0m。变截面砖柱采用MUl0级烧结普通砖、M10级混合砂浆砌筑,砌体施工质量控制等级为B级。假定,荷载组合不考虑吊车作用。试问,其变截面柱下段排架方向的计算高度Hl
采用小导管加固时,为保证工作面稳定和掘进安全,应确保小导管()。
以下关于迁移的理解中,错误的是()。
一次逻辑考试后,兰兰、晶晶、玲玲在一起讨论考试成绩:兰兰说:“如果我能得100分,则晶晶也能得100分。”晶晶说:“我看兰兰能得100分,我不能得100分。”玲玲说:“如果我能得100分,则晶晶得不了100分。”事实上,考试成绩出来后,证明她们三个
车间准备加工1000个零件,每小组完成的定额数可以唯一确定.(1)按定额平均分配给6个小组,则不能完成任务(2)比定额多1个的加工任务平均分给6个小组,则可超额完成任务
最新回复
(
0
)