首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
The expanding International Space Station has living space, a laboratory, storage modules and solar power panels. Now it will ge
The expanding International Space Station has living space, a laboratory, storage modules and solar power panels. Now it will ge
admin
2010-06-18
94
问题
The expanding International Space Station has living space, a laboratory, storage modules and solar power panels. Now it will get a backbone. The space shuttle Atlantis is set to take off for the station with a huge truss crammed into its cargo bay. The goal of the l l-day mission is to attach the central part of what will eventually become a support beam for the station.
The truss is made up of metal crossbars and filled with wiring, pipes, computers and other equipment. It is to be attached to the station during four spacewalks by the seven-member crew. The astronauts will also attach a mobile transport platform to tracks atop the truss, the first part of a 300-foot (100-meter) mini-railroad that will carry a robotic arm and crew members back and forth across the station on future construction and repair jobs.
Atlantis’s 25th flight will be the first in the 21-year history of the shuttle program for which the National Aeronautics and Space Administration will delay announcing the precise launching time for a civilian mission. Citing heightened security since Sept. 11, the agency said that liftoff would occur between 2 and 6 p.m. and that it would not announce the official time until 24 hours before the flight.
Before launching, NASA must determine that he 58-foot Canadian - built robot arm attached to the station is operating properly, since it will be critical in installing the truss. The multijointed Canadarm 2, as it is called, was installed last April and has since experienced periodic problems. In some operations recently, the brake on one of the arm’ s seven joints has not released properly, causing it to malfunction.
To work around the problem, Canadian engineers wrote new computer software to operate the arm with six joints. The three-member resident crew at the station is testing the new operating procedures for installing the truss. If the software patch fails, the mission could be delayed several days until the problems are worked out.
Adding the center truss element begins a new phase for the $ 60 billion station, a 16-nation project led by the United States in cooperation with Russia, Japan, Canada and members of the European Space Agency. Over the next two years, six other girder sections will be added to serve as the home for four giant solar power arrays, heat radiators and other equipment that must be in place before attaching science modules from other nations.
The "truss" is______.
选项
A、a space shuttle that carries a support beam
B、a mobile transport platform
C、a framework designed to support devices
D、a laboratory
答案
C
解析
转载请注明原文地址:https://www.kaotiyun.com/show/GxlO777K
0
专业英语八级
相关试题推荐
ForyearswehavebeentalkingaboutaddictiontotheInternet,andthentothemobilephone.ArecentsurveyinUKfoundthat_
ThetradedisputebetweentheEuropeanUnionandtheUSwascausedby______.
1Doyoueverfeelasthoughyouspendallyourtimeinmeetings?2HenryMintzberg,inhisbookTheNatureofManageria
Themanstoletheaircraftmainlybecausehewantedto______.
Themanstoletheaircraftmainlybecausehewantedto______.
EskimovillagestodayarelargerandmorecomplexthanthetraditionalnomadicgroupsofEskimokinsmen.Villagedecisionmaking
Whyshouldanyonebuythelatestvolumeintheever-expandingDictionaryofNationalBiography?Idonotmeanthatitisbad,as
OppositiontotheVietnamWarintheUnitedStatesdevelopedimmediatelyafterthebeginningofthewar,chieflyamongtradition
______,oneofBritain’slargestports,rosetoworldwidefameinthe1960sasthebirthplaceoftheBeetles.
Thetraditionalimageofcavedwellersisprobablyape-likecreaturescladinskimpyanimalskins,completewithclubsandmatte
随机试题
关于方丝弓第一序列弯曲正确的是
患者,男,70岁。咳嗽、咳痰,伴痰中带血3个月。胸片提示右肺门类圆形阴影,边缘毛躁,有分叶。该患者最可能的诊断
甲冒用解放军某部指导员的名义,利用人民群众对子弟兵热爱的心理,实施诈骗活动。甲的行为构成:()
根据《合同法》的规定,既具有对合同未违约方给予补偿,又具有对违约方实行制裁双重性质的是( )。
根据《建设项目工程总承包合同(示范文本)》通用条款规定,合同签订后,因法律、国家政策和需遵守的行业规定发生变化,影响到合同价格增减的,需要在发生变化后()日内,将调整金额及调整原因以书面形式通知对方或监理人。
关于防眩设施施工安装要求的说法,正确的是()。
某国发生自然灾害导致专注该国市场的国内旅游机构倒闭,给客户旅游贷款带来的风险属于()。[2016年6月真题]
国内住房贷款业务的正式全面启动的是()。
下列人力资源供需平衡方法中,速度快、员工受伤程度高的是()。
简述隋唐时期私学的发展。
最新回复
(
0
)