A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be complet
admin
2020-08-10
54
问题
A project is a [temporary] (71) of unique, complex, and connected activities having one goal or purpose and that must be completed by a specific time, within budget, and according to (72).
Project management is the process of scoping, planning, staffing,organizing, directing, and controlling the development of a(n) (73) system at a minimum cost within a specified time frame.
For any systems development project, effective project management is necessary to ensure that the project meets the (74) , is developed within an acceptable budget, and fulfills customer expectations and specifications. Project management is a process that starts at the beginning of a project, extends through a project, and doesn’t culminate until the project is completed.
The prerequisite for good project management is a well-defined system development process. Process management is an ongoing activity that documents, manages the use of, and improves an organization’s chosen methodology (the “process”)for system development. Process management is concerned with the activities, deliverables, and quality standards to be applied to (75) project(s).
(72)
选项
A、specifications
B、rules
C、estimates
D、designs
答案
A
解析
转载请注明原文地址:https://www.kaotiyun.com/show/FUCZ777K
本试题收录于:
软件设计师上午基础知识考试题库软考中级分类
0
软件设计师上午基础知识考试
软考中级
相关试题推荐
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical
The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical
Networks can be interconnected by different devices. In the physical layer, networks can be connected by(66)or hubs, which just
In the open systems interconnection(OSI)reference model, "layer" means one of seven conceptually complete,(71)arranged groups
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The notion of NP-completeness has provided a(66)mathematical definition for(67)intractability of NP problems. But this measure a
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control
随机试题
下列各项中不符合恶性胸腔积液特点的是
患者腹大胀满不舒,早宽暮急,面色苍黄,脘闷纳呆,神倦怯寒,四末不温,尿少不利,舌淡胖而紫,脉沉弦无力,其治法为:
健康牛肺叩诊区后界线应经过肩关节水平线与()。
分项工程质量检验和评定,由单位工程负责人组织有关人员检查,由质量检查员核定质量等级。
借款人的贷款申请应遵循“诚信申贷”的基本要求,以下不符合这一要求的是()。
甲公司将拥有的“飞天”注册商标使用在其生产的乐器产品上。甲公司与乙公司签订商标使用许可合同,许可乙公司在其生产的乐器上使用“飞天”注册商标。根据商标法的规定,下列表述中,正确的有( )。
在企业借款利息的支付方式中,会使企业所负担的实际利率高于名义利率的利息支付方式有()。
程序不能无限期地拖延下去,而必须在合理的时间期限内终结,说的是正当程序的()
(2009年上半年)所谓信息系统集成是指(1)。
Whatisthepassagemainlyabout?
最新回复
(
0
)