首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
51
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
At least ______ points of details may be listed in the above incomplete least.
选项
A、3
B、4
C、5
D、6
答案
B
解析
转载请注明原文地址:https://www.kaotiyun.com/show/BWKd777K
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
Accordingtotheman,whatchangewillbemadetothecompany?
Accordingtotheman,whatchangewillbemadetothecompany?
Whattypeofcompanyisthecallerworkingfor?
随机试题
下列人物不是国民教育思想的代表的是
简述急性肛裂的非手术治疗。
全科医学是
脂肪管型最有助于诊断白细胞管型最有助于诊断
合理用药的基本要素包括( )。
艾滋病的传播方式包括()
A将汇票背书转让给B,并记载“不得转让”,而B又将汇票转让给C,那么B对C承担票据责任,而A对C()。
附属单据包括()。
(1)党员站出来(2)穿好消防衣(3)石油井喷(4)冒火前进(5)终于关上闸门
1905年至1907年间,围绕中国究竟是采用革命手段还是改良方式这个问题,革命派与改良派展开了一场大论战,其主要舆论阵地是
最新回复
(
0
)