首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
Dear Mr. Blank: Last October I signed a contract with your company for the installation of dry walls and the renovation
admin
2010-01-10
73
问题
Dear Mr. Blank:
Last October I signed a contract with your company for the installation of dry walls and the renovation of a bathroom in my home at the above address. I am now appealing to you to have this work completed in a satisfactory manner.
I have spoken to your Quincy, Mass, store manager on several occasions, to the plumbing department manager, to your maintenance people, and to anyone else who seemed to be in a position to assist in completing the work. I have received considerate responses followed by service people trying to do the necessary work.
Nevertheless, I have had expensive broadloom rugs badly stained; I have had water pour through my kitchen ceiling at least six times after your people left my home with everything supposedly in order; and I now again have leaks, grout falling out, and other defects. I have experienced nothing but trouble with your workmanship and materials from the outlet. I will illustrate with detail--an incomplete list--which your records should confirm.
1. An expensive vanity was delivered with doors assembled upside down and doors catches not functioning properly.
2. The dry wall work was left in such rough condition that your installers had to return several times. In some areas sanding was overlooked; in others, dry wall taping was not used, and molding was left incomplete. (The next few paragraphs listed additional defects.)
Mr. Blank, I had your service people come to the house at least six were denials of responsibility. Children were blamed, etc. And in each case, it was finally established that the installation was faulty. At this writing, water is again leaking to the floor below when the shower is used.
Frankly, I believe I have reached the point of no return in dealing with your local staff.
I now want to have my bathroom completed in a workmanlike manner, even if it means removing the entire installation. In the event that any removal is necessary, I will not accept a patched-up finish.
For a job that costs about 2,500, your performance has been outrageously bad. I expect the courtesy of a prompt reply from you, and the necessary inspections and corrections from qualified personnel.
Sincerely yours,
Howard Gerber
At least ______ points of details may be listed in the above incomplete least.
选项
A、3
B、4
C、5
D、6
答案
B
解析
转载请注明原文地址:https://www.kaotiyun.com/show/BWKd777K
本试题收录于:
BEC高级阅读题库BEC商务英语分类
0
BEC高级阅读
BEC商务英语
相关试题推荐
Accordingtothewoman,whyhasthecompanygoneoveritsbudgetthisquarter?
Forabouthowlonghasthecompanybeeninbusiness?
Whendidthemanstartworkingatthiscompany?
WhatwilltheStonebarkCompanydoonMarch1?
Accordingtotheman,whatchangewillbemadetothecompany?
Accordingtotheman,whatchangewillbemadetothecompany?
Accordingtotheman,whatchangewillbemadetothecompany?
Whattypeofcompanyisthecallerworkingfor?
随机试题
原尿成分与血浆成分不同的是
某网吧因违法被查封而停业50天。其问,网吧门被撬开,屋内电脑被盗走50台。现网吧老板要求国家赔偿,则国家应:()
罚款和罚金均属于法律责任中的行政责任。()
下列关于存单纠纷案件认定与处理的说法中,正确的是()。
①由“形符”和“声符”组合起来的字就是形声字②现在的汉字,大部分都是用这种方法造出来的③我们的祖先想到一个好办法,他们把一个字分成两部分④用图形构成的象形文字有很大的局限性,它无法分辨相似的事物⑤另一部分是一个同音(或近音)的字,用来表示事物的读音
在关系数据库中,表(table)是三级模式结构中的
Oncethelawyeraskedadoctortocurehimofhisillness.ThelawyertoldthedoctorthatheWouldgivehimalotofMoneyifhe
Anniversariesaretheopiumofmuseums,publishers,theatersandoperahouses.Fixingtheireyesonsomeround-numberbirthord
HenrysparesnoefforttogettwoticketsfortheconcertheldattheSportsCentre._______.
Directions:YourfriendPeterneedstomakeadecisioninchoosingtostudyhistoryorcomputerscience.Hereallylikeshistory
最新回复
(
0
)