首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Art Murals According to the discussion, what factors should be considered in planning a mural? Click on two answers.
Art Murals According to the discussion, what factors should be considered in planning a mural? Click on two answers.
admin
2013-04-25
145
问题
Art Murals
According to the discussion, what factors should be considered in planning a mural? Click on two answers.
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、The position of the observer
B、The character of the artist
C、The architecture of the room
D、The colors of the paint
答案
AC
解析
In planning a mural, the position of the observer should be considered: We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. The architecture of the room should also be considered: A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design....(2.2)
转载请注明原文地址:https://www.kaotiyun.com/show/8SyO777K
0
托福(TOEFL)
相关试题推荐
SECTION2Questions11-20Questions11-13Completethetablebelow.WriteNOMORETHANTHREEWORDSORANUMBERforeachanswer
SECTION3Questions21-30Questions21-23CompletethenotesonwhatMikasaysatthebeginningofthediscussion.Mikasays
PrairieDogbarkshave______meanings.【34】
Completethenotesbelow.WriteNOMORETHANTHREEWORDSforeachanswer.Otherrequirementsfortheprojectextractchosen
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
Choosethecorrectletter,A,BorC.Grace’sCreekActivityCampOnebuildinghasnotbeendecidedyet,butwillprobablybe
Thefollowingareessentialrequirementsforwhichjobs?Writethecorrectletter,A,BorC,nexttoQuestions11-15.Essential
Thefollowingareessentialrequirementsforwhichjobs?Writethecorrectletter,A,BorC,nexttoQuestions11-15.Essential
Whichattitudeisassociatedwiththefollowingpeopleduringtheconversation?ChooseSIXanswersfromtheboxandwritetheco
随机试题
针对某3×50m预应力混凝土连续梁桥动载试验,试回答下列问题。可用于自振特性测定的激励方法包括()。
常用的寿命周期成本评价方法有()。
施工阶段质量控制要点包括:技术交底、工程测量以及()等方面。
在建的建筑工程因故中止施工的,建设单位应当自中止施工之日起( )内,向发证机关报告,并按照规定做好建筑工程的维护管理工作。
有效市场假说表明,在有效市场中,投资者不仅能获得与其承担风险相匹配的那部分收益,还能获得高出风险补偿的收益。()
甲公司和乙公司采用的会计政策和会计期间相同,2015年至2016年有关长期股权投资及其内部交易或事项如下:(1)2015年度①1月1日,甲公司以银行存款18400万元自非关联方购入乙公司80%有表决权的股份。交易前,甲公司不持有乙公司的股份且与乙公司不
左边给定的是纸盒的外表面.右边哪一项能由它折叠而成?
设总体X~N(μ,σ2)未知,x1,x2,…,xn是来自该总体的样本,记,则对假设检验H0:u=H←→H1:u≠u0使用的t统计量t=________(用,Q表示);其拒绝域ω=________.
随着Internet的发展,越来越多的计算机感染病毒的可能途径之一是()。
ShouldWeHelptheOldPeopleupfromaFall?1.是否应该去扶跌倒的老人引起了激烈的争论2.出现这种现象的原因3.我的观点
最新回复
(
0
)