首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
考研
A. Benefiting from an earlier model B. Important operative conditions C. Examining the public confusion D. How it’s all linked u
A. Benefiting from an earlier model B. Important operative conditions C. Examining the public confusion D. How it’s all linked u
admin
2014-02-27
71
问题
A. Benefiting from an earlier model
B. Important operative conditions
C. Examining the public confusion
D. How it’s all linked up
E. Finding a suitable location
F. Comparing wind speeds in Australian cities
G. Matching operational requirements with considerations of appearance
Harvest time in Esperance is constant. As long as the wind blows — which is pretty much all the time — nine identical synchronized wind turbines reap the benefits of the dependable winds that gust up around the southern coastline of Western Australia. These sleek, white, robot-like wind turbines loom up on the horizon forming part of Australia’s first commercial wind farm. They’re not only functional machines that help provide electricity for this secluded coastal town, but increasingly, they’re also draw cards for curious tourists and scientists alike.
Because of its isolation, Esperance is not linked to Western Power’s grid which supplies electricity from gas-, coal- and oil-fired power stations to the widespread population of Western Australia. Before the wind turbines went in, Esperance’s entire electricity needs were met by the diesel power station in town.
【D1】______
The $5.8 million Ten Mile Lagoon project is not Esperance’s first wind farm. The success of a smaller, experimental wind farm, at a spot called Salmon Beach, encouraged the state’s power utility to take Esperance wind seriously. Today, the wind turbines at Ten Mile Lagoon work in conjunction with the diesel power station, significantly reducing the amount of the town’s electricity generated by expensive diesel power.
【D2】______
The wind farm is connected to the power station by a 33-kilovolt powerline, and a radio link between the two, allows operators to monitor and control each wind turbine. The nine 225-kilowatt Vestas wind turbines produce a total generating capacity of two megawatts and provide around 12 percent of the energy requirements of Esperance and its surrounding districts.
【D3】______
The power produced by a wind turbine depends on the size and efficiency of the machine and, of course, on the energy in the wind. The energy in the wind available to the wind turbines is proportional to wind speed cubed. Thus, the greater the wind speed, the greater the output of the turbine. In order to achieve optimum wind speeds, the right location is imperative. "You have to accept the nature of the beast," Mr. Rosser, Western Power’s physicist said. "As surface dwellers our perceptions of wind speeds are bad. As you go higher, wind speed increases significantly."
【D4】______
The most favorable wind sites are on gently sloping hills, away from obstructions like trees and buildings and where the prevailing winds are not blocked. Computer modeling was used to select the best site for Esperance’s wind farm. Scientists were concerned not only with efficiency, but also with protecting the coastal health environment which is rich in plant life and home to tiny pygmy and honey-possums, and a host of bird species. In addition, the wind farm is adjacent to Esperance’s popular scenic tourist drive.
【D5】 ______
Strict erosion controls have been implemented and access to the wind farm is limited to selected viewing areas. The wind turbine towers are painted white and devoid of corporate logos or signage. According to Mr. Rosser there is something of a worldwide backlash against wind farms with regard to their visual impact. "But because wind turbines perform best in the most exposed positions, they will always be visible. There is a very real need to balance environmental and technical requirements. I think the Ten Mile Lagoon Wind Farm sets the standards for environmentally friendly developments."
In fact, the project has become something of a tourist attraction in itself. Esperance shire president Ian Mickel said the wind turbines had been well accepted by locals. "We have watched the wind farm develop with great interest, and now we find visitors to Esperance are equally enthusiastic about it," he said. The aim now is to identify other remote locations where wind turbines will be a feasible means of supplementing existing power stations.
【D1】
选项
答案
A
解析
现在的风力发电站出现之前,曾经建立了一个试验性的小型电站。它的成功激励了现在风力发电站的建立。
转载请注明原文地址:https://www.kaotiyun.com/show/5UO4777K
0
考研英语一
相关试题推荐
-Wheredidtheaccidenthappen?-Itwasatthepostofficenearthehotel______thepeacetalkwouldbeheld.
Businessandgovernmentleadersconsidertheinflationratetobeanimportantindicator.Inflationisaperiodof【C1】______spen
I’d______hisreputationwithotherfarmersandbusinesspeopleinthecommunity,andthenmakeadecisionaboutwhetherornott
Withonlyabout1,000pandasleftintheworld,Chinaisdesperatelytryingtoclonetheanimalandsavetheendangeredspecies.
Digitalphotographyisstillnewenoughthatmostofushaveyettoformanopinionaboutit【1】developapointofview.Butthis
TheAmericaneconomicsystemisorganizedaroundabasicallyprivate-enterprise,market-orientedeconomyinwhichconsumerslarg
Theprotectionofculturaldiversityfromapoliticalandeconomicpointofviewinfactbecamepressingwithglobalization,whi
Farm-raisedpigsaredirty,smellyanimalsthatgetnorespect.They’realsoanenvironmentalhazard.Theirmanurecontainsphos
Farm-raisedpigsaredirty,smellyanimalsthatgetnorespect.They’realsoanenvironmentalhazard.Theirmanurecontainsphos
EricHansenwritesabouttravelasaparticipatingenthusiastratherthanamereobserver.(46)Itgivesthesenineessays,based
随机试题
姜黄的性味是
咪唑类H2受体拮抗剂的代表性药物是
计算机五大部件相互间传递信号由总线来完成根据信号类型的不同,总线分为二类:地址总线和数据总线。()
投资性房地产的计量模式一经确定,不得随意变更,只有存在确凿证据表明其公允价值能够持续可靠取得的,才允许采用公允价值计量模式。()
测题的编写程序包括()。
环境移民,是指人类生存的自然环境和人居环境受到突发或渐进式的不利影响而产生的各种人口迁移行为,包括自愿的、非自愿的、事后被迫的、预先计划的,暂时的、永久性的,个体和家庭自发的、政府主导的移民类型。根据上述定义,以下不属于环境移民的是:
托宾q理论是用来解释货币政策通过影响货币市场进而影响投资支出,从而传导货币政策意图的。[对外经济贸易大学2013研]
“十四五”时期,要围绕国家重大区域发展战略,把握文化产业发展特点规律和资源要素条件,促进形成文化产业发展新格局。为此,必须
在C++中,cin是一个()。
Inthesentence"Shewalksoutofthehouse,followedbyalittleboy",thepastparticipleisusedas
最新回复
(
0
)