首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Orbital Space Plane While scientists are searching the cause of the Columbia disaster, NASA is moving ahead with plans to develo
Orbital Space Plane While scientists are searching the cause of the Columbia disaster, NASA is moving ahead with plans to develo
admin
2009-06-15
91
问题
Orbital Space Plane
While scientists are searching the cause of the Columbia disaster, NASA is moving ahead with plans to develop a new craft that would replace shuttles on space station missions by 2012 and respond quickly to space station emergencies.
The space agency released the first set of mission needs and requirements several days ago for the orbital space plane, which would be designed to transport a crew of four to and from the International Space Station.
Although it includes few specifics, the plan stipulates the orbiter will be safer, cheaper and require less preparation time than the shuttle. It would be able to transport four crew members by 2012 - though it would be available for rescue missions by 2010. NASA says the craft should be able to transport injured or ill space station crew members to "definitive medical care" within 24 hours.
The release of the requirements showed NASA remains focused on the long-term priorities of space exploration, even as questions linger concerning the loss of Columbia and its seven-member crew on February 1, 2003.
Experts at Marshall Space Flight Center in Huntsville, Alabama, have been working for years on a successor to the shuttle. The project, known as the Space Launch Initiative, was divided last year into two parts - one focusing on a future launch vehicle, the other on a space station orbiter. The orbiter is expected to be ready sooner.
The program’s managers say NASA officials have told them not to alter Space Launch Initiative in light of the Columbia disaster.
US President George W. Bush asked Congress for about US$1 billion for Space Launch Initiative in 2004, funds that would be almost equally split between the Orbital Space Plane and Next Generation Launch Technology.
选项
A、controlling the International Space Station.
B、carrying astronauts to the International Space Station.
C、transporting equipment to the International Space Station.
D、training astronauts in space flights.
答案
B
解析
答案的依据是第二段的“…which would be designed to transport a crew of four to and from the International Space Station.”
转载请注明原文地址:https://www.kaotiyun.com/show/3WGd777K
本试题收录于:
职称英语综合类基础题库职称英语分类
0
职称英语综合类基础
职称英语
相关试题推荐
HighwaysintheUSTheUnitedStatesiswell-knownforitsnetworkofmajorhighwaysdesignedtohelpadrivergetfromone
HighwaysintheUSTheUnitedStatesiswell-knownforitsnetworkofmajorhighwaysdesignedtohelpadrivergetfromone
Thesecondinjectionshouldhavebeengivenoncethefirstdrughadtakeneffect.
Accordingtothepassage,whichofthefollowingisthemostpollutingenergyresource?Whichcountrytooktheleadinmakingu
SunspotsIt’snotsurprisingthatsunspots(太阳黑子)wereobservedbyancientastronomers(天文学家).Thelargestsunspotsonthes
A.StuctureandinterpretationofadreamB.AncientviewsondreamsC.BabiesdreamlessthanolderchildrenD.Dreamingmaybe
WhatDoDreamsTellUs?1Whydowedream?Dodreamshavemeanings?Thesearequestionswhichhavetroubledmanforthousands
AOngoingResearchBExtensionofUseCRobotHeroesDGreaterReliabilityEFailingDemandFHiddenDanger*
CementwasseldomusedinbuildingtheMiddleAges.
A.Ford’sFollowersB.TheAssemblyLineC.Ford’sGreatDreamD.TheEstablishmentoftheCompanyE.Ford’sBiggestContribut
随机试题
内源性哮喘与下列哪些因素有关
能与GDP/GTP结合的蛋白质是
中骨盆平面狭窄的孕妇,最容易发生的异常是
A.情志抑郁B.惊恐C.悲伤D.大喜E.思虑过度痫证发生密切相关的病因是()
依法对实行招标投标的政府采购工程建设项目的预算执行情况和政府采购政策执行情况实施监督的是()。
某锅炉燃煤量100t/h,煤含硫量1%,硫进入灰渣中的比例为20%,烟气脱硫设施的效率为80%,则排入大气中的SO2量为()。
商业银行设立分支机构有哪些方面的限制?
违法分包中的不具备相应资质条件的单位是指( )。
甲公司为上市公司,属于增值税一般纳税人,适用增值税税率为17%;采用资产负债表债务法核算所得税,适用所得税税率为25%;按净利润的10%提取盈余公积。2014年度实现利润总额2000万元,2014年度的财务报告于2015年1月10日编制完成,批准报出日为2
在各种有影响的动机理论中,归因理论最为强调()。(2017·河南)
最新回复
(
0
)