You will hear five different people talking about the issues involved in having new buildings constructed and advice about new c
You will hear five different people talking about the issues involved in having new buildings constructed and advice about new c
admin
2018-03-18
65
问题
You will hear five different people talking about the issues involved in having new buildings constructed and advice about new construction projects.
For each extract, there are two tasks. For Task One, decide what problem occurred with the construction project from the list A-H. For Task Two, choose what advice about new construction projects each speaker gives from the list A-H.
After you have listened once, replay the recording.
Task One - Problem with new construction project
For questions 13-17, match the extracts with the problem that occurred with the new construction project, listed A-H.
For each extract, choose the problem that occurred with the new construction project.
Write one letter (A-H) next to the number of the extract.
A A completion stage on the building was missed.
B Spending on installations exceeded projected figures.
C The managers’ offices were poorly located.
D Equipment was inadequately tested.
E Ineffective air-conditioning was installed.
F Insufficient parking space was provided for delivery vehicles.
G Plans failed to include access to the site.
H Contractors’ costs went over budget.
Speaker3______
Part Two. Questions 13 to 22.
You will hear five different people talking about the issues involved in having new buildings constructed.
For each extract there are two tasks. Look at Task One. For each question, 13 to 17, decide what problem occurred with the construction project, from the list A-H. Now look at Task Two. For each question, 18-22, choose what advice about new construction projects each speaker gives, from the list A-H.
After you have listened once, replay the recording.
You now have 30 seconds to read the two lists.
[pause]
Now listen, and do the two tasks.
[pause]
Speaker One
Man: We decided to open this new production facility on the outskirts of Madrid. I think we felt that the location was not too difficult to commute to, space not a problem, etc. The proposal was well within budget, so we didn’t spot the fact that the necessary link road wasn’t included in the developer’s original outline. The problem was fixed, but completing on time was very tight - we nearly missed the opening. I think with hindsight I’d say that once you’ve sorted out your contractors, it’s worth making a small internal group responsible for overseeing things so somebody is looking at the detail. And this pays off even if they have to put aside their own work for a while.
Speaker Two
Woman: Things never turn out as planned when you’re looking at building. Costs always overrun, so we thought we were very smart in keeping a tight rein on the contractors. This focus on the site meant the manager responsible for internal fixtures, etc was on his own and went way over budget. It’ll take us a while to recoup this and, as you can imagine, he’s not very happy at the moment. Still, it’s a lesson. I think I’d recommend that this is not handled internally and that, even for smaller parts of the contract, it’s worth getting a range of companies to put in a bid. They, and you, are then tied to the best deal and your staff are not tested beyond their abilities!
Speaker Three
Man: There are always technical problems when you’re building on a new site - we couldn’t even get onto the site in the first week because the access hadn’t been finished on time. But it’s the ongoing problems that prevent it being a success such as new equipment constantly breaking down or, as in our case, a faulty ventilation system, which now needs replacing. In future, I would make sure I’d checked out whoever was fitting it with their previous customers. I think it’s important to give them targets of certain standards you want them to fulfil throughout the process. Perhaps it’s also worth getting a fairly senior member of staff to check up on these contractors.
Speaker Four
Woman: I have to say that when we built the new site in the Aosta valley the route in was very steep and we thought parking would be an issue - it was a big facility with lots of staff. We didn’t foresee that worrying about that would mean that the construction work fell behind and the contractors didn’t meet one of their interim deadlines. Fortunately, we still managed to control the costs. But it’s a learning curve and if we did it again, I think we could look into what other options were possible. We were offered what looked like a good deal, and we took it without really considering all the possibilities that the consultants on the project had suggested.
Speaker Five
Man: When you’re expanding onto a new site, I think it’s important to make sure the schedule is realistic. We really rushed through the various completion stages and prided ourselves on reaching all our targets. But this meant certain things were overlooked and we suffered a series of problems in the first few months the facility was open. We sent very few managers to the site as there wasn’t much space for them and that meant there weren’t enough people around to arrange the necessary checks on the machinery that kept the whole site operational. Certainly, I would recommend that several different options are considered when you’re arranging after-sales contracts. Make it competitive and make sure you get one that includes regular checks.
选项
答案
E
解析
转载请注明原文地址:https://www.kaotiyun.com/show/16Kd777K
本试题收录于:
BEC高级听力题库BEC商务英语分类
0
BEC高级听力
BEC商务英语
相关试题推荐
A、 B、 C、 D、 C图片中桥横跨在江面上,人们在船上划桨,由此可以联想到river,water,bridge,boat,people,oar,row等几个单词。(A)选项中的pickup是指接送。人们
A、 B、 C、 D、 A通过图片中人们在公园里休息或行走的情景,可以联想到park,bench,people,sit,relax,walk等几个单词。应注意(B)选项中的indoors(室内)和(C)选项中
Atwhattimewillthefirstgroupspeakerspeak?
Whoisthespeakerprobablyaddressing?
What’stherelationshipbetweenthemanandthewoman?
What’stherelationshipbetweenthemanandthewoman?
Whataretheytalkingabout?
Whomostlikelyisgivingthetalk?
WhatkindofbusinessisDombeyandSons?
A、 B、 C、 D、 DSomebusinesspeopleareseatedaroundatable,talkingaboutsomepapersordocuments.Choice
随机试题
根据定金罚则,给付定金的一方不履行约定债务的,无权要求返还定金,收受定金的一方不履行约定债务的,应当_______。
免疫组织化学过程不包括
尖锐湿疣好发于:
鹅口疮心脾积热证的首选方剂是
自截肾的X线征像表现为
等直杆的受力情况如图5-1所示,则杆内最大轴力FNmax和最小轴力FNmin分别为()。
当按工程项目施工层次划分系统控制过程时,( )的质量控制是最基本的质量控制。
【2015年安徽.单选】学生上课思想开小差、心不在焉,教师突然加重语气是为了引起学生的()。
平衡计分卡方法认为,组织应从()角度审视自身业绩。
请在【答题】菜单下选择【进入考生文件夹】命令,并按照题目要求完成下面的操作。注意:以下的文件必须都保存在考生文件夹下。小李是东方公司的会计,利用自己所学的办公软件进行记账管理,为节省时间,同时又确保记账的准确性,她使用Excel编制了2