首页
外语
计算机
考研
公务员
职业资格
财经
工程
司法
医学
专升本
自考
实用职业技能
登录
外语
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season
Engineering for sustainable development The Greenhouse Project (Himalayan mountain region) Problem Short growing season
admin
2022-03-30
151
问题
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________ , so are expensive
Need to use sunlight to prevent local plants from【L33】________
Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________ to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________ for the roof)
Building and maintenance done by local craftsmen
Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________ are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________ have greater opportunities
More children are educated
【L32】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low.
In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter,
which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter.
And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful.
The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap.
Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering.
In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone,
there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on.
They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities.
They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
air
解析
空格前的or连接两个并列的介词短语,推测应填入一个名词。录音原文中的by truck是题目by lorry的同义替换,根据后文的并列词提示可直接填入air。
转载请注明原文地址:https://www.kaotiyun.com/show/0u8O777K
本试题收录于:
雅思听力题库雅思(IELTS)分类
0
雅思听力
雅思(IELTS)
相关试题推荐
Lookatthefollowingstatements(Questions31-35)andthemethodsintheboxbelow.Matcheachstatementwiththecorrectpa
Questions27-30ForeachquestiononlyONEofthechoicesiscorrect.Writethecorrespondingletterintheappropriateboxony
Questions27-30ForeachquestiononlyONEofthechoicesiscorrect.Writethecorrespondingletterintheappropriateboxony
Questions27-30ForeachquestiononlyONEofthechoicesiscorrect.Writethecorrespondingletterintheappropriateboxony
Questions27-30ForeachquestiononlyONEofthechoicesiscorrect.Writethecorrespondingletterintheappropriateboxony
Questions27-30ForeachquestiononlyONEofthechoicesiscorrect.Writethecorrespondingletterintheappropriateboxony
Questions15-21ReadingPassage2hasnineparagraphsA-I.Fromthelistofheadingsbelowchoosethemostsuitableheadingfor
Questions15-21ReadingPassage2hasnineparagraphsA-I.Fromthelistofheadingsbelowchoosethemostsuitableheadingfor
ListtheFOURmainwaysinwhichBritishcompanieshavetriedtosolvetheproblemofthelanguagebarriersincethe1960s.Writ
随机试题
中央性颌骨骨髓炎弥散破坏期的主要X线表现是
在贸易救济方面,根据我国对外贸易法的有关规定,对外贸易救济措施不包括()。
依据《建设项目竣工环境保护验收技术规范一生态影响类》,验收调查工作阶段划分正确的是()。
合同工程完工验收应由项目法人主持。验收工作组应由项目法人以及与合同工程有关的()等单位的代表组成。
通过事先约定基金的风险收益分配,将基础份额分为预期风险收益不同的子份额,并可将其中部分或全部份额上市交易的结构化证券投资基金是()。
下列各项中,不属于应计入损益的利得的是()。
下列行为中,()符合“银行业从业人员与所在机构”职业操守要求。
某国家机关采购一批货物,甲供应商与其成交,经过该国家机关同意,甲将该成交项目分包给乙和丙。根据规定,甲的这种分包行为是不符合法律规定的。()
根据下列材料回答问题。以下各月中,哪个月全行业保险赔付支出额与保险保费收入额的比值最低?()
心脏的搏动引起血液循环。对同一个人,心率越快,单位时间进入循环的血液量越多。血液中的红血球运输氧气。一般的说,一个人单位时间通过血液循环获得的氧气越多,他的体能及其发挥就越佳。因此,为了提高运动员在体育比赛中的竞技水平,应该加强他们在高海拔地区的训练,因为
最新回复
(
0
)